Cutting Down Time in Manufacturing
Weldall

The Project
Weldall reduced setup times from 6 or 7 hours to 1.5 hours on some parts and achieve 100% accuracy.
The Challenge
Metal forming shops, regardless of the size of the operation or the projects they tackle, are all faced with the task of laying up parts for assembly. It requires precision and time – a lot of time.

The Solution
The Iris SPS enabled Weldall to reduce setup times from six or seven hours to 1.5 hours on some parts and achieve 100 percent accuracy.